Connect-CTYŽ

   Translation
  Spanish   French   German

Transportation
(704) 875-6541
bcoxe@huntersville.org

Bill Coxe
Transportation Planner
bcoxe@huntersville.org

Prosperity Church Rd. Extension / Asbury Chapel Rd. Relocation / Verhoeff Dr. Extension - Corridor Study

September 14 Workshop Update

Nearly 70 residents attended a public workshop at Central Piedmont Community College, North Campus on September 14th to review possible alternatives for:

  • ·        Prosperity Church Road Extension (Eastfield Road to NC-73)
  • ·        Asbury Chapel Road Relocation (Trails End Lane to Ramah Church Road)
  • ·        Verhoeff Drive Extension (Prosperity Church Extension to Eastfield Road)

Bill Coxe of the Town of Huntersville opened the meeting by providing an overview of the alternatives developed during the study.

He then responded to questions from meeting attendees.  Click here for a summary of the question and answer session.

Meeting attendees completed surveys to obtain their opinions on the evaluation categories being used to grade the alternatives and their preferences on the alternatives themselves.  Click here for a summary of the surveys submitted by 42 workshop participants.  

 

 


Transportation Home Page

Prosperity Church Rd. Extension / Asbury Chapel Rd. Relocation / Verhoeff Dr. Extension - Corridor Study

Northeast Huntersville Minor Thoroughfare

NC73 Widening

I-77/NC-73 Interchange Improvements Study

Two-Way Pair

Torrence Creek Greenway

Maps

Traffic Flow Guides

FAQ's

Transportation Links

Featured Links

 

 

Huntersville Town Hall
101 Huntersville-Concord Road
704.875.6541