Project Overview 

 

The Town of Huntersville is initiating a planning study and has executed a contract with the consulting firm of Gresham, Smith and Partners (GS&P) to evaluate the transportation needs in the northwest area of Huntersville, specifically focusing on how Ervin Cook Rd, Hugh Torrance Pkwy and Birkdale Commons Pkwy alignments connect to NC73 and help to improve economic viability of land in the area. The study is anticipated to be completed by early 2018 and will include public meetings, surveys and coordination with town’s planning board and the town board.

 

The Project Team's approach to the Northwest Huntersville Transportation Study is to take a comprehensive look at the mobility needs for all travel modes in the study area and incorporate that information into the alignments and cross sections for each of the proposed thoroughfares. The team will ensure that those facilities are both buildable and functional and that our work products are sufficient to aide staff in protecting appropriate rights of way. Throughout this study we will seek public input to engage, inform and improve the study process.

We will be working with you and your neighbors to find a best available solution. The technical analysis and your involvement will help the Town Board select proper alignments, design, and connections for a comprehensive system of future road, bicycle, and pedestrian facilities. 

*****[Click on the images above to open a larger flyer/map]*****

 

Background 

 

In 2007, the Mecklenburg-Union Metropolitan Planning Organization (MUMPO), now the Charlotte Regional Transportation Planning Organization (CRTPO), began a study of thoroughfares in this area with particular attention to the intersection of the future Vance Road Extension with NC 73 and in the context of the Beatties Ford Road Small Area Plan. That study was initially scoped to determine the alignments for the thoroughfares, however, the study became focused on the future of NC 73 west of the Vance Road Extension/Beatties Ford Road area. Determination of the alignments of the other thoroughfares known as Birkdale Commons Parkway, Hugh Torrance Parkway, and Ervin Cook Road were delayed. A map showing the CRTPO adopted alignment for NC 73 as well as potential alignments for the other studied thoroughfares can be seen  here.

In 2016, the NCDOT began the study of environmental impacts of widening NC 73 between NC 16 in Lincoln County and I-77 in support of a Transportation Improvement Program project that is scheduled to being construction in 2023. The proposed study will build on the findings of the 2007 study and analyze options to better connect the thoroughfares and other local streets in the vicinity of NC 73 and Beatties Ford Road. This study will coordinate with the NC 73 environmental study to ensure integration of the entire system.

 

 

Project Resources:

 

For more information please contact:

 

 Sushil Nepal, AICP
 Principal Planner / Project Manager
 704-766-2213 / snepal@huntersville[dot]org
The Town of Huntersville and the GS&P team’s approach to the Northwest Huntersville Transportation Study is to take a comprehensive look at the mobility needs for all travel modes in the study area and incorporate that information into the alignments and cross sections for each of the proposed thoroughfares. The team will ensure that those facilities are both buildable and functional and that our work products are sufficient to aide staff in protecting appropriate rights of way. Throughout this study we will seek public input to engage, inform and improve the study process.